Is service delivery visible enough to support the next decision?
Use facility coverage, payment records, and unresolved flags to distinguish operating evidence from a hardware-only claim.
Next action: confirm denominator and payment trace.A North Kivu monitoring pilot connecting facility power performance, payment evidence, and health-system learning.
North Kivu treats electrification as a service to be maintained, financed, measured, and translated into health-system learning—not only as an installation event.
Use facility coverage, payment records, and unresolved flags to distinguish operating evidence from a hardware-only claim.
Next action: confirm denominator and payment trace.Use freshness, meter reporting, voltage/frequency traces, and review queues to route maintenance and mapping work.
Next action: resolve stale, candidate, or incomplete mappings.Keep source, transformation, assumption, model, result, and paper-packet boundaries visible for audit and publication.
Next action: lock the source cut and methods note.Every external-facing statement should be traceable through this chain.
Release boundary for external presentation.
Anonymized facility codes, aggregate telemetry, source dates, and bounded decision cues are visible here.
Held backNamed facilities, serial numbers, room/load notes, private review notes, and unapproved health or payment detail remain outside this surface.
A compact sequence for a funder, technician, or research audience.
Electrification is a reliability and accountability problem.
Telemetry and payment evidence create an operating record.
Facility-level coverage exposes current signal and gaps.
Actions can be assigned before claims are escalated.
Denominators, ledger cleaning, and health linkage need review.
Bounded agent outputs converge on one human release gate.
Frames outcome, denominator, timing, evidence, and caveat.
Checks freshness, quorum, outliers, mappings, and next action.
Protects source, assumption, model, result, and paper-packet boundaries.
Private mode uses named operational facilities.
Paired GridWatch supply-quality and Prospect HOP demand telemetry.
Open a view to inspect the existing figures, time series, and sensor summaries.
DRC7.1 manuscript figures for capital, payment performance, and ledger sustainability.
Filterable event-level detail retained for audit and operational inspection.
A proposed 0–100 method for assessing the evidence chain around classification, allocation, documentation, reconciliation, and project separation.
The project has not approved the denominator or exclusions. No final grade is displayed, and this calculator does not determine a payout, audit opinion, or disbursement.
Enter exploratory dimension scores only when a reviewer has evidence for the selected source cut.
Open work before publication.
Agree denominator and exclusions.
Clean the ledger and preserve row-level trace.
Separate project flows before any external grade.
Funds and expenses tab with a methods note.
Private mode reveals facility names, serials, and field notes.
Mockup combining facility context, intervention specs, monitoring coverage, and provenance-sorted media.
Project origins, implementation context, partner roles, and public learning record.
What this starter uses and what private mode includes.